18031 / 18040 Vicksburg Warren School District Reroofs, Phase 1

  • Vicksburg Warren School District 1500 Mission 66 Vicksburg, MS, 39180 United States (map)

Please note that this is a Dale | Bailey, an Association Project

18031 / 18040 Vicksburg Warren School District Reroofs, Phase 1, Vicksburg, Mississippi
Contract A:  18031 Beechwood Elementary Reroof
Contract B:  18040 Warren Central High Reroof

Budget:  Contract A:  $1.2M and Contract B:  $2.1M

Contract A: Beechwood Elementary Reroof is a total roof replacement. This includes removal of all existing roofing down to existing roof deck and replacement with a Styrene-
Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing System. The work will
also include replacement of all fascias, copings, roof drains, gutters, expansion joint
covers, roof hatches, roof ladders and other associated roof equipment.

Contract B: Warren Central High School Reroof is a total roof replacement. This includes removal of all existing roofing down to existing roof deck and replacement with a SBS Modified Bituminous Membrane Roofing System. The work will also include replacement of all fascias, copings, roof drains, gutters, expansion joint covers, roof hatches, roof ladders and other associated roof equipment.

Addendum No. 1 - 06.12.18
Addendum No. 2 - 06.20.18

Prebid Conference:  Thursday, 06.14.18 at 10:00 AM at the Vicksburg Warren School District, 1500 Mission 66, Vicksburg, MS 39180.

Bid Opening:  Thursday, 06.28.18 @ 2:00 PM at the Vicksburg Warren School District, 1500 Mission 66, Vicksburg, MS 39180.